QMS Departments — departments
QCD—
Quality Control
Inspection & Test
HSE—
Health, Safety & Environment
Policies, Plans, Forms
ADM—
Administration
Procedures & Registers
HRD—
Human Resources
Contracts, Certificates
WHS—
Warehouse
Delivery & Receipt
PRD—
Procurement
POs, RFQs, RFPs
PCD—
Project Control
Budgets, WBS, Specs
FND—
Finance
Vouchers & Records
COM—
Commercial
Other Documents
Projects — projects
SKG
Industrial Gas Pipeline (IGP)
—Documents
—Disciplines
Procedures · ITPs · Registers · Plans
HTU
Hydrotreater Unit
—Documents
—Categories
Procedures · ITPs · Specifications
HPU
Hydrogen Production Unit
—Documents
—Categories
E&I · Equipment · Piping · Valve
PPCL
PPCL Project
—Documents
—Categories
Workspace created · awaiting documents
Select a project
Choose a project from the bar above to view its documents. Active projects: SKG-261, HTU, HPU.
📦
— · No documents yet
This project workspace has been created, but no documents have been uploaded or assigned to it yet. Documents will appear here once they are added to the system.
HSE POLICIES (7)
1 OPCO-EBL-230-HSE-GN-PLY-001 QHSE-Policy
2 OPCO-EBL-230-HSE-GN-PLY-002 PPE Policy
3 OPCO-EBL-230-HSE-GN-PLY-003 Stop Work Policy
4 OPCO-EBL-230-HSE-GN-PLY-004 Drugs & Alcohol Policy
5 OPCO-EBL-230-HSE-GN-PLY-005 Driving Policy
6 OPCO-EBL-230-HSE-GN-PLY-006 FTW Policy
7 OPCO-EBL-230-HSE-GN-PLY-007 Non Smoking Policy
HSE PROCEDURES (70)
18 C noise Assess Checklist
22. MOC13-16-17-AAZ-GE-PRC-018 - H2S PROCEDURE
37 Working at Height Procedure SALP-HSE-P-05-014
5.d.SALP-Audit Procedure
6 OPCO-EBL-230-HSE-GN-PLY-006 Security Policy
Drop Object Procedures SALP-HSE-P-05-013
Emergency Preparedness & Response Procedure
H2S PROCEDURE
H2S Procedures
HAV-EXT-HS-PRO-0146 PTW PROCEDURE
HEAT STRESS PROCEDURE
HSE Audit Proforma
HSE Performance Scoring Matrix - Guidelines
HSE Subcontractor Project Management SALP-PPC-528-HSE-00-PLN-040
Heat Stress Procedure SALP-HSE-SP-05-027
Heat Stress- Rony
Heat Stress
Industrial Hygiene Procedure
Industrial Hygiene Procedure SALP-HSE-P-05-016
Internal Audit Procedure-SALP-HSE-00-PRO-007
Internal Audit calendar
Medical Emergency Response Plan MERP
Noise – What is Dose and how is it calculated
OPCO-EBL-230-HSE-GN-PRO-003 NOISE MANAGEMENT PRO
OPCO-EBL-230-HSE-GN-PRO-004 PPE Pro
OPCO-EBL-230-HSE-GN-PRO-005 HSE Training & Competency Procedure
OPCO-EBL-230-HSE-GN-PRO-006 Emergency Response Pro
OPCO-EBL-230-HSE-GN-PRO-007 MEDICAL EMERGENCY RESPONSE PROCEDURE
OPCO-EBL-230-HSE-GN-PRO-008 HAZARD IDENTIFICATION & CONTROL PROCEDURE
OPCO-EBL-230-HSE-GN-PRO-009 Risk Assessment Management Procedure
OPCO-EBL-230-HSE-GN-PRO-010 Incident & Accident Reporting & Investigation Procedure
OPCO-EBL-230-HSE-GN-PRO-011 Stop Work Authority Procedure
OPCO-EBL-230-HSE-GN-PRO-012 Excavation & Trenching Procedure
OPCO-EBL-230-HSE-GN-PRO-013 Control of Hazardous Material Procedure
OPCO-EBL-230-HSE-GN-PRO-014 Confined Space Entry Procedure
OPCO-EBL-230-HSE-GN-PRO-015 Housekeeping Procedure
OPCO-EBL-230-HSE-GN-PRO-016 Drop Object Procedure
OPCO-EBL-230-HSE-GN-PRO-017 Working at Height Procedure M
OPCO-EBL-230-HSE-GN-PRO-018 Heat Stress Procedure
OPCO-EBL-230-HSE-GN-PRO-019 Permit To Work Procedure
OPCO-EBL-230-HSE-GN-PRO-020 Behavior Base Safety Procedure
OPCO-EBL-230-HSE-GN-PRO-021 Security Pro
OPCO-EBL-230-HSE-GN-PRO-022 Industrial Hygiene Procedure
OPCO-EBL-230-HSE-GN-PRO-023 SUBCONTRACTORS & SUPPLIERS Pro
OPCO-EBL-230-HSE-GN-PRO-024 H2S Procedure
OPCO-EBL-230-HSE-GN-PRO-025 Lighting and Illumination Guideline
OPCO-EBL-230-HSE-GN-PRO-026 AUDITS & CLOSE-OUT PROCEDURE
OPCO-EBL-230-HSE-GN-PRO-027 Lifting, Rigging & Slinging Procedure
OPCO-EBL-230-HSE-GN-PRO-028 SAFETY VEHICLE OPERATION
OPCO-EBL-230-HSE-GN-PRO-029 Scaffolding Pro.
OPCO-EBL-230-HSE-GN-PRO-030 Traffic Management Procedure
OPCO-EBL-230-HSE-GN-PRO-031 MATERIAL AND EQUIPMENT MOBILIZATION PROCEDURE
OPCO-EBL-230-HSE-GN-PRO-032 Gas Test Procedure
PPE
Permit to work system PTW)
SA8000-Side-By-Side-2008-and-2014-Latest
SALP-HSE-00-PLN-008 EMS Control Plan
Safe Lifting Procedure SALP-HSE-P-05-002
Safety Vehicle Operation Procedure SALP-HSE-P-05-035
Scaffolding Procedure @
heat illness prevention
~�LP ISO450012018 Audit Checklist
HSE PLANS (65)
1-STOPCARD.M2018
10. MOC13-16-17-AAZ-GE-PRC-006 - LAND TRANSPORT PROCEDURE
12 Live Saving Rules
121-003-CN-PLN-0016 A 3 Lowering-in lifting plan
121-003-HS-PLN-0001 0 - HSE Plan PPCL Approved
2-Environmental checklist
552-SLP-WSM-000 - Waste shipping manifest form
Annex 1 HSE Policy
Annex 3 DA Policy
Appendix-2G Part-1 Attachment-16 Outline-HSE-Manual
COVID -19 INFECTIOUS DISEASE PREPAREDNESS AND RESPONSE PLAN
COVID -19 INFECTIOUS DISEASE PREPAREDNESS AND- ORIGINAL
Environmental Action Plan
Environmental Action Plan SALP-PPC-528-HSE-00-PLN-003
H & S Plan KPIZ-209 - Rev 004
HSE PLAN CONTENT 1
HSE PLAN CONTENT
HSE PLAN FOR PIPE LINE CONSTRUCTION
HSE PLAN-GM413-41318-103-HS-PL-0001 A code 3
HSE PLAN-SALP-KAR-Supplier of materials, equipment to CONTRACTOR- Aug 2021
HSE PLAN SALP GAZPROM - Copy
HSE Plan Energean
HSE Requirement for KPC Project-Draft
KU-TWK-10-HS-PLN-0204 0 IFU
KU-TWK-10-HS-PLN-0204 PROJECT HSE PLAN
KU-TWK-10-HS-PLN-0205 DNO ER PLAN
KU-TWK-10-HS-PLN-0206 DNO EVACUATION PLAN
KU-TWK-10-HS-PLN-0207 DNO ER PLAN
KU-TWK-10-HS-PLN-0208 DNO EVACUATION PLAN
KU-TWK-40-HS-PLN-2106 Rev. A HSE Plan
KU-TWK-42-HS-PLN-0201 0 IFU Contractor Project HSE plan
KU-TWK-42-HS-PLN-0201 B DNO-PROJECT-HSE PLAN-ST
KU-TWK-50-HS-PLN-2104 B IFR PROJECT HSE PLAN
Motivation may be dfined as
OPCO-EBL-230-HSE-GN-PLN-002 Wast Management Plan
OPCO-EBL-230-HSE-GN-PLN-004 Emergency Responce Plan
OPCO-EBL-230-HSE-GN-PLN-005 Health Plan
OPCO-EBL-230-HSE-GN-PLN-006 Land Transport Plan
OPCO-EBL-230-HSE-GN-PLN-007 Planned Preventative Maintenance(PPM)
OPCO-EBL-230-HSE-GN-PLN-008 General Lifting Plan
OPCO-EBL-230-HSE-GN-PLN-09 COVID -19 INFECTIOUS DISEASE PREPAREDNESS AND RESPONSE PLAN
SALP ME-HSE-Plan for PPCL Khor Mor 500 Project Editable
SALP-DNO-138-HSE-00-PLN-001 HSE Plan
SALP-DNO-163-HSE-00-PLN-001 HSSE Plan
SALP-GKS-316-HSE-00-PLN-001 HSSE Plan Remain duration
SALP-GKS-316-HSE-00-PLN-001 HSSE Plan
SALP-GKS-316-HSE-00-PLN-002 Waste Management Plan
SALP-HSE Plan-KPC Project-Proposal LASTTT
SALP-HSE Plan-KPC Project-Proposal
SALP-HSE-00-PLN-004 Emergency Response Plan
SALP-HSE-00-PLN-005 Health Plan
SALP-HSE-00-PLN-008 EMS Control Plan
SALP-HSE-00-PLN-043 Health Plan AH 230622
SALP-HSE-00-PLN-044 Land Transport Plan
SALP-PPC-528-HSE-00-PLN-002 Waste Management Plan
SALPME HSE PLAN FOR PIPELINE CONSTRUCTION
SP-HSE-Emergency Response Plan
SP-HSE-Health Plan
Waste Management 2
Waste Management Procedure SALP-HSE P 07-01 2017
Waste management 1
HSE FORMS (21)
OPCO-EBL-230-HSE-GN-FRM-001 TBT Form
OPCO-EBL-230-HSE-GN-FRM-002 HSE Training Report Form
OPCO-EBL-230-HSE-GN-FRM-003 HSE Weekly Meeting Form
OPCO-EBL-230-HSE-GN-FRM-004 Induction Attendance Sheet
OPCO-EBL-230-HSE-GN-FRM-005 Fire Extinguisher Visual Inspection Form Jan.24
OPCO-EBL-230-HSE-GN-FRM-006 Near Miss Report Form
OPCO-EBL-230-HSE-GN-FRM-007 Incident Reporting & Investigation Form
OPCO-EBL-230-HSE-GN-FRM-008 Visitor Log Form
OPCO-EBL-230-HSE-GN-FRM-009 Environmental Monitoring Hazards
OPCO-EBL-230-HSE-GN-FRM-010 Technical Lift Plan
OPCO-EBL-230-HSE-GN-FRM-011 Emergency Drill Reporting Form
OPCO-EBL-230-HSE-GN-FRM-012 Safety Self Evaluation Survey Supervisor Form
OPCO-EBL-230-HSE-GN-FRM-013 Safety Award Nomination Form
OPCO-EBL-230-HSE-GN-FRM-014 Daily Medical Treatment Form
OPCO-EBL-230-HSE-GN-FRM-015 Weekly Air Quality Site Inspection Report
OPCO-EBL-230-HSE-GN-FRM-016 HOT PTW Form
OPCO-EBL-230-HSE-GN-FRM-017 COLD PTW Form
OPCO-EBL-230-HSE-GN-FRM-018 Confined Space Entry PTW
OPCO-EBL-230-HSE-GN-FRM-019 Training Evaluation Form
OPCO-EBL-230-HSE-GN-FRM-020 OPCO Monthly HSE Performance Report - 0002 Aug.2024
OPCO-EBL-250-HSE-GN-FRM-021 HSE Committee Meeting - 2024 Q4
HSE INSPECTION CHECKLIST (23)
OPCO-EBL-230-HSE-GN-CHL--023 Housekeeping Checklist
OPCO-EBL-230-HSE-GN-CHL-001 Excavator Safety Inspection Checklist
OPCO-EBL-230-HSE-GN-CHL-002 Daily Vehicle Safety Inspection Checklist
OPCO-EBL-230-HSE-GN-CHL-003 Air compressor Safety Inspection Checklist
OPCO-EBL-230-HSE-GN-CHL-004 Scaffolding Safety Inspection Checklist
OPCO-EBL-230-HSE-GN-CHL-005 Generator Safety Inspection Checklist
OPCO-EBL-230-HSE-GN-CHL-006 RVSIC
OPCO-EBL-230-HSE-GN-CHL-007 HSE Site Inspection - Top Management Visit
OPCO-EBL-230-HSE-GN-CHL-008 HSE Weekly Site Inspection
OPCO-EBL-230-HSE-GN-CHL-009 Pipelayer Sideboom Safety Inspection Checklist
OPCO-EBL-230-HSE-GN-CHL-010 Bulldozer Safety Inspection Checklist
OPCO-EBL-230-HSE-GN-CHL-011 Heavy Equipment Safety Insp. Checklist
OPCO-EBL-230-HSE-GN-CHL-012 Crane Safety Inspection Checklist
OPCO-EBL-230-HSE-GN-CHL-013 Grader Safety Inspection Checklist
OPCO-EBL-230-HSE-GN-CHL-014 Welding Machine Safety Inspection Checklist
OPCO-EBL-230-HSE-GN-CHL-015 Power Tools Safety Inspection Checklist
OPCO-EBL-230-HSE-GN-CHL-016 Site Security Checklist
OPCO-EBL-230-HSE-GN-CHL-017 Compressed Gas Cylinders Safety Checklist
OPCO-EBL-230-HSE-GN-CHL-018 - Canteen Inspection Checklist
OPCO-EBL-230-HSE-GN-CHL-019 Tractor (Paywelder )Safety Inspection Checklist
OPCO-EBL-230-HSE-GN-CHL-020 DAILY HSE SITE REPORT
OPCO-EBL-230-HSE-GN-CHL-021 HIAB Safety Inspection Checklist
OPCO-EBL-230-HSE-GN-CHL-022 Shovel Safety Inspection Checklist
HSE REGISTERS (11)
OPCO-EBL-230-HSE-GN-REG-001 HSE Management System Documents Register (MSDR) 2024
OPCO-EBL-230-HSE-GN-REG-003 Lifting Equipment Register 3rd Party Certificates & Inspection
OPCO-EBL-230-HSE-GN-REG-004 Corrective Action Tracking Register
OPCO-EBL-230-HSE-GN-REG-005 HEALTH, SAFETY AND ENVIRONMENT PERFORMANCE STATISTICS
OPCO-EBL-230-HSE-GN-REG-006 ENVIRONMENT RISK REGISTER
OPCO-EBL-230-HSE-GN-REG-007 Measurable HSE Objectives JUL-2023
OPCO-EBL-230-HSE-GN-REG-008 Opportunity register
OPCO-EBL-230-HSE-GN-REG-009 Risk Register
OPCO-EBL-230-HSE-GN-REG-010 Task Risk Assessment Register
OPCO-EBL-230-HSE-GN-REG-011 Legal requirements and compliance
Procedures (1)
OPCO-EBL-230-ADM-00-PRO-001 Non-Conformance Procedures
Policies (6)
OPCO-EBL-230-ADM-00-PLY-001 Code of Ethics Policy & Procedures
OPCO-EBL-230-ADM-00-PLY-002 Delegation of Authority Policy & Procedures
OPCO-EBL-230-ADM-00-PLY-003 Communication Compensation Policy & Procedures
OPCO-EBL-230-ADM-00-PLY-004 Corporate Calendar Policy & Procedures
OPCO-EBL-250-ADM-00-PLY-005 Corporate Social Responsibility (CSR) Policy
OPCO-EBL-250-ADM-00-PLY-006 Anti-Bribery and Corruption Policy
Forms (3)
Charts (1)
OPCO-EBL-250-ADM-00-CHR-001 Project Charter
Registers (2)
Log Sheets (1)
OPCO-EBL-230-ADM-00-LGS-001 Non-Conformance Log Sheet
Reports (2)
Other Documents (1)
Minutes of Meeting Form
Procedures (3)
Policies (14)
OPCO-EBL-230-HRD-00-PLY-001 Awards Policy
OPCO-EBL-230-HRD-00-PLY-002 Attendance & Leave Policy
OPCO-EBL-230-HRD-00-PLY-003 Premium Compensation Policy
OPCO-EBL-230-HRD-00-PLY-004 Performance Evaluation Policy&Procedures
OPCO-EBL-230-HRD-00-PLY-005 Employment Policy
OPCO-EBL-230-HRD-00-PLY-006 Travel Authaurization Policy & Procedures
OPCO-EBL-230-HRD-00-PLY-007 Meals Allowance Policy
OPCO-EBL-230-HRD-00-PLY-008 Work-Based education Training Plan Policy
OPCO-EBL-230-HRD-00-PLY-009 Reduction In Force Policy
OPCO-EBL-240-HRD-00-PLY-010 Local Workforce Participation Policy
OPCO-EBL-250-HRD-00-PLY-011 Employee Seperation Policy
OPCO-EBL-250-HRD-00-PLY-012 Conflict of Interest Policy
OPCO-EBL-250-HRD-00-PLY-013 Disciplinary Action Policy--------
OPCO-EBL-250-HRD-00-PLY-014 Company Vehicle Policy
Forms (16)
OPCO-EBL-230-HRD-00-FRM-001 Application for Employment Form
OPCO-EBL-230-HRD-00-FRM-002 Vacancy Announcement Form
OPCO-EBL-230-HRD-00-FRM-003 Bonus Payment Nomination Form
OPCO-EBL-230-HRD-00-FRM-004-Job Offer Form
OPCO-EBL-230-HRD-00-FRM-005 Personnel Enrollment Action Form
OPCO-EBL-230-HRD-00-FRM-006 Authorization for Leave Request Form
OPCO-EBL-230-HRD-00-FRM-007 Premium Compensation Request Form
OPCO-EBL-230-HRD-00-FRM-008 Authorization&Certification of Training
OPCO-EBL-230-HRD-00-FRM-009 Travel Authorization
OPCO-EBL-230-HRD-00-FRM-010 Check-in&Check-out Form
OPCO-EBL-230-HRD-00-FRM-011 Nomination For Award Form
OPCO-EBL-230-HRD-00-FRM-012 Position Description-Form
OPCO-EBL-230-HRD-00-FRM-013 Employee Record Form
OPCO-EBL-230-HRD-00-FRM-014 Request for Contract Amendment Form
OPCO-EBL-230-HRD-00-FRM-015 Staffing Pattern Form
OPCO-EBL-250-HRD-00-FRM-016 Project Manager Yearly Goals
Charts (2)
Registers (1)
OPCO-EBL-230-HRD-00-REG-001 HR Documents Register
Log Sheets (2)
Letters (1)
OPCO-EBL-230-HRD-00-LTR-001 Leave Restriction Letter
Agreements (1)
OPCO-EBL-230-HRD-00-AGR-001 Work-Based Education Training Paid Agreement
Certificates (5)
OPCO-EBL-230-HRD-00-CER-001 Employee of the Year
OPCO-EBL-230-HRD-00-CER-002 Driver of the Year
OPCO-EBL-230-HRD-00-CER-003 Employee of the Month
OPCO-EBL-230-HRD-00-CER-004 HSE Excellence Employee of the Month
OPCO-EBL-240-HRD-00-CER-005 Certificate of Achievement 23-Oct-24
Contracts (3)
Reports (7)
OPCO-EBL-230-HRD-00-RPT-001 Time & Attendance Monthly Rport
OPCO-EBL-230-HRD-00-RPT-002 Performance Evaluation Report
OPCO-EBL-230-HRD-00-RPT-003 Performance Evaluation RPT Unskilled&Law Skilled
OPCO-EBL-230-HRD-00-RPT-004 Annual Training Courses Report
OPCO-EBL-230-HRD-00-RPT-005 Employee Weekly Productivity Report
OPCO-EBL-230-HRD-00-RPT-006 Performance Evaluation RPT Skilled&Semi-Skilled
OPCO-EBL-230-HRD-00-RPT-007 Weekly Productivity Report
Procedures (1)
OPCO-EBL-240-WHS-00-PRO-001 0 Repair and Maintenance Procedure
Forms (2)
Registers (1)
OPCO-EBL-230-WHS-00-REG-001 Instruments & Measuring Tools Register
Delivery Notes (2)
Receipt Notes (1)
OPCO-EBL-230-WHS-00-RNT-001 Receipt Note
Reports (2)
Other Documents (1)
Warehouse Database
Procedures (2)
Forms (11)
OPCO-EBL-230-PRD-00-FRM-001 Supplier Evaluation Form
OPCO-EBL-250-PRD-00-FRM-002 General Terms and Condition
OPCO-EBL-250-PRD-00-FRM-003 Quotation Evaluation Form
OPCO-EBL-250-PRD-00-FRM-006 Acknowledgement Letter Form
OPCO-EBL-250-PRD-00-FRM-007 Confidentiality Undertaking Form
OPCO-EBL-250-PRD-00-FRM-008 Technical Deviations Form
OPCO-EBL-250-PRD-00-FRM-009 Commercial Deviations Form
OPCO-EBL-250-PRD-00-FRM-010 Compensation Form
OPCO-EBL-250-PRD-00-FRM-011 Clarification Request Form
OPCO-EBL-250-PRD-00-FRM-012 Purchase Request Form
OPCO-EBL-250-PRD-00-FRM-013 Proposal Technical Evaluation Form
Charts (1)
OPCO-EBL-250-PRD-00-CHR-001 Supply Chain Flow Chart
Lists (1)
OPCO-EBL-230-PRD-00-LST-001 Approved Vendor List
Letters (1)
OPCO-EBL-250-PRD-00-LTR-001 Invitation to Bid Letter
Agreements (1)
OPCO-EBL-250-PRD-00-AGR-001 Service Agreement
Purchase Orders (1)
OPCO-EBL-230-PRD-00-POR-001 Purchase Order
RFP (1)
OPCO-EBL-250-PRD-00-RFP-001 Request For Proposal (RFP)
RFQ (1)
OPCO-EBL-250-PRD-00-RFQ-001 Request for Quotation
Budgets (1)
OPCO-EBL-230-PCD-00-BGT-001
Business Cases (1)
OPCO-EBL-230-PCD-00-BSC-001 Business Case
Project Control (1)
OPCO-EBL-230-PCD-00-PCP-001 Project Control Plan
Technical Spec (1)
OPCO-EBL-230-PCD-00-TSC-001
WBS (1)
OPCO-EBL-230-PCD-00-WBS-001
Vouchers (1)
OPCO-EBL-240-FND-00-VOU-001 Warehouse Material Voucher
Procedures (9)
OPCO-UTD-251-QCD-00-PRO-001 0 IFU Piping Fabrication and Installation Procedure
OPCO-UTD-251-QCD-00-PRO-002 0 IFU Piping Hydrotesting Procedure
OPCO-UTD-251-QCD-00-PRO-003 0 IFU Aboveground Blasting & Painting Procedure
OPCO-UTD-251-QCD-00-PRO-004 0 IFU Piping Insulation and Cladding Procedure
OPCO-UTD-251-QCD-00-PRO-005 0 IFU E&I Works Procedure
OPCO-UTD-251-QCD-00-PRO-007 0 IFU Steel Structure Installation Procedure
OPCO-UTD-251-QCD-00-PRO-008 0 IFU Equipment Installation Procedure
OPCO-UTD-251-QCD-00-PRO-009 0 IFU Communication & Document Control Procedure
OPCO-UTD-251-QCD-00-PRO-010 0 IFU Engineering Design Deviations and Technical Query Procedure
Inspection & Test Plans (3)
Specifications (1)
OPCO-UTD-251-QCD-00-SPC-001 1 IFU PQR & WPS
E&I (8)
APPENDIX-A UR-HPU-EIA-BOQ-02 Bill of Quantity for Electrical, Instrumentation, Automation System
APPENDIX-B UR-HPU-IN-IRR-03 Instrumentation Inspection Registration Report
APPENDIX-C UR-HPU-EL-IRR-04 Electrical Inspection Registration Report
APPENDIX-D UR-HPU-CSIS-IRR-05 Automation Inspection Registration Report
APPENDIX-E UR-HPU-EL-SD-06 MCC Schematic Diagram
APPENDIX-F UR-HPU-FGS-IRR-07 Fire & Gas Inspection Registration Report
APPENDIX-G UR-HPU-EIA-RSPL-08 Recommended Spare Parts Lists
Equipment (1)
Piping (6)
📦
No documents yet.
Manuals (2)
Plans (1)
OPCO-EBL-230-QCD-DC-PLN-001 1 Quality Plan
Procedures (15)
OPCO-EBL-230-QCD-00-PRO-014 Welding Repair Rate Control Procedure
OPCO-EBL-230-QCD-DC-PRO-001 1 Document Numbering Procedure
OPCO-EBL-230-QCD-DC-PRO-002 1 Document Control Procedure
OPCO-EBL-230-QCD-DC-PRO-003 1 Internal Audit Procedure
OPCO-EBL-230-QCD-DC-PRO-004 1 Management Review Procedure
OPCO-EBL-230-QCD-DC-PRO-005 1 Nonconformity and Corrective Action Procedure
OPCO-EBL-230-QCD-DC-PRO-006 1 Risk and Opportunity Management Procedure
OPCO-EBL-230-QCD-DC-PRO-007 1 Training and Competence Procedure
OPCO-EBL-230-QCD-DC-PRO-008 1 Supplier and Subcontractor Evaluation Procedure
OPCO-EBL-230-QCD-DC-PRO-009 1 Inspection and Test Control Procedure
OPCO-EBL-230-QCD-DC-PRO-010 1 Equipment Calibration and Measurement Control Procedure
OPCO-EBL-230-QCD-DC-PRO-011 1 Communication Procedure
OPCO-EBL-230-QCD-DC-PRO-012 1 Change Management Procedure
OPCO-EBL-230-QCD-DC-PRO-013 1 Monitoring and Measurement Procedure
OPCO-EBL-230-QCD-DC-PRO-015 1 Customer Satisfaction Procedure
Forms (7)
OPCO-EBL-230-QCD-DC-FRM-004 Management Review Minutes of Meeting
OPCO-EBL-230-QCD-DC-FRM-006 Non-Conformance Report
OPCO-EBL-230-QCD-DC-FRM-007 Supplier Evaluation Form
OPCO-EBL-230-QCD-DC-FRM-009 Change Request Form
OPCO-EBL-230-QCD-DC-FRM-010 Document Number Request Form (DNRF)
OPCO-EBL-230-QCD-DC-FRM-011 Customer Satisfaction Survey
OPCO-EBL-230-QCD-DC-FRM-012 Contract Review Checklist
Registers (12)
OPCO-EBL-230-QCD-DC-REG-003 NCR Register
OPCO-EBL-230-QCD-DC-REG-004 Risk and Opportunity Register
OPCO-EBL-230-QCD-DC-REG-005 Job Competence Matrix
OPCO-EBL-230-QCD-DC-REG-006 Training Register
OPCO-EBL-230-QCD-DC-REG-007 Approved Supplier List
OPCO-EBL-230-QCD-DC-REG-008 Master Equipment List
OPCO-EBL-230-QCD-DC-REG-009 Correspondence Register
OPCO-EBL-230-QCD-DC-REG-010 RFI Register
OPCO-EBL-230-QCD-DC-REG-011 Change Register
OPCO-EBL-230-QCD-DC-REG-012 KPI Tracking Dashboard
OPCO-EBL-230-QCD-DC-REG-015 Customer Feedback Register
OPCO-EBL-230-QCD-DC-REG-016 Lessons Learned Register
Schedules (2)
Inspection & Test Plans (1)
OPCO-EBL-230-QCD-DC-ITP-001 Inspection and Test Plan Template
Reports (2)
Punch Lists (1)
OPCO-EBL-230-QCD-DC-PUN-001 Punch List
MDR (1)
OPCO-EBL-230-QCD-DC-MDR-002 Master Document Register (MDR)
Other Documents (1)
OPCO Measurable Quality Objectives 2025
📦
— · No documents yet
This department has been created in the QMS, but no documents have been uploaded or assigned to it yet. Documents will appear here once they are added to the system.
12 inch - 16.5mm - X70 - E7018
101-002-QA-PRD-0002 0 IFU Welding Procedure Specification (WPS)
161-037-QA-PRD-0002 0 IFU Welding Procedure Specification (WPS)
GM552-55219-104-PI-SP-0004 0 AFC Piping Welding Procedure Specification (WPS)
SALP-DNO-WPS-PGP-PI-003
SALP-DNO-WPS-PGP-PI-004
SALP-DNO-WPS-PGP-PI-005
SALP-DNO-WPS-PGP-PI-006
SALP-DNO-WPS-PGP-PI-007
SALP-DNO-WPS-PGP-PI-008
in service WPS
📦
WQT · Pipeline · No documents yet
Documents will appear here once they are added to the library.
📦
WQT · Piping · No documents yet
Documents will appear here once they are added to the library.
📦
WQT · In-Service · No documents yet
Documents will appear here once they are added to the library.
Receiving Inspection Checklists (All Disciplines)
OPCO-SKG-261-QCD-PL-PRO-005 Cold Bending Procedure
OPCO-SKG-261-QCD-PL-PRO-006 Mainline Welding Procedure
OPCO-SKG-261-QCD-PL-PRO-007 Tie-In Welding Procedure
OPCO-SKG-261-QCD-PL-PRO-008 Welder Qualification Test Procedure
OPCO-SKG-261-QCD-PL-PRO-009 Field Joint Coating (FJC) Application Procedure
OPCO-SKG-261-QCD-PL-PRO-010 Fibre Optic Cable (FOC) Installation Procedure
OPCO-SKG-261-QCD-PL-PRO-011 Pipe Lowering-In, Padding and Bedding Procedure
OPCO-SKG-261-QCD-PL-PRO-012 Backfilling and Compaction Procedure
OPCO-SKG-261-QCD-PL-PRO-013 Horizontal Directional Drilling (HDD) Procedure
OPCO-SKG-261-QCD-PL-PRO-014 Pipeline Cleaning, Gauging, Hydrostatic Testing, Dewatering and Drying Procedure
OPCO-SKG-261-QCD-PL-PRO-015 As-Built Survey and Documentation Procedure
OPCO-SKG-261-QCD-PL-PRO-016 Cathodic Protection (CP) Installation Procedure
OPCO-SKG-261-QCD-PL-PRO-017 Pin Brazing Installation Procedure
OPCO-SKG-261-QCD-PI-PRO-001 Pipe and Fitting Receipt, Handling, Storage and Preservation Procedure
OPCO-SKG-261-QCD-PI-PRO-002 Piping Fabrication Procedure
OPCO-SKG-261-QCD-PI-PRO-003 Piping Welding Procedure
OPCO-SKG-261-QCD-PI-PRO-004 Piping Installation and Erection Procedure
OPCO-SKG-261-QCD-PI-PRO-005 Bolted Flange Joint Assembly Procedure
OPCO-SKG-261-QCD-PI-PRO-006 Pressure Testing (Hydrostatic and Pneumatic) Procedure
OPCO-SKG-261-QCD-PI-PRO-007 Piping Painting and Coating Procedure
OPCO-UTD-251-QCD-00-PRO-001 0 IFU Piping Fabrication and Installation Procedure
OPCO-UTD-251-QCD-00-PRO-002 0 IFU Piping Hydrotesting Procedure
OPCO-UTD-251-QCD-00-PRO-003 0 IFU Aboveground Blasting & Painting Procedure
OPCO-SKG-261-QCD-CS-PRO-001 Earthworks and Grading Procedure
OPCO-SKG-261-QCD-CS-PRO-002 Concrete Works Procedure
OPCO-SKG-261-QCD-CS-PRO-003 Structural Steel Fabrication and Erection Procedure
OPCO-SKG-261-QCD-CS-PRO-004 Anchor Bolt Installation and Grouting Procedure
OPCO-SKG-261-QCD-EQ-PRO-001 Equipment Installation Procedure
OPCO-SKG-261-QCD-EL-PRO-001 Electrical Material Receiving Inspection Procedure
OPCO-SKG-261-QCD-EL-PRO-002 Cable Tray and Cable Installation Procedure
OPCO-SKG-261-QCD-EL-PRO-003 Electrical Equipment Installation Procedure
OPCO-SKG-261-QCD-EL-PRO-004 Earthing and Lightning Protection Procedure
OPCO-SKG-261-QCD-EL-PRO-005 Electrical Testing Procedure
OPCO-SKG-261-QCD-EL-PRO-006 Functional Testing and Loop Checks Procedure
OPCO-SKG-261-QCD-IN-PRO-001 Instrument and Telecom Material Receiving Inspection Procedure
OPCO-SKG-261-QCD-IN-PRO-002 Instrument Installation Procedure
OPCO-SKG-261-QCD-IN-PRO-003 Instrument Cable and Gland Installation Procedure
OPCO-SKG-261-QCD-IN-PRO-004 Junction Box and Panel Wiring Procedure
OPCO-SKG-261-QCD-IN-PRO-005 Instrument Calibration and Loop Testing Procedure
OPCO-SKG-261-QCD-IN-PRO-006 Telecom System Installation and Testing Procedure
OPCO-SKG-261-QCD-00-ITP-001 ITP for Pipeline Works
OPCO-SKG-261-QCD-00-ITP-002 ITP for Piping Works
OPCO-SKG-261-QCD-00-ITP-003 ITP for Equipment Installation Works
OPCO-SKG-261-QCD-00-ITP-004 ITP for Civil Structural Works
OPCO-SKG-261-QCD-00-ITP-005 ITP for Electrical Works
OPCO-SKG-261-QCD-00-ITP-006 ITP for Instrumentation & Telecom Works
OPCO-SKG-261-QCD-00-PLN-001 Construction Quality Plan
OPCO-SKG-261-QCD-CS-SPC-001 Specification for Camp Steel Structure Painting Works