Select a project
Choose a project from the bar above to view its documents. Active projects: SKG-261, HTU, HPU.
— · No documents yet
This project workspace has been created, but no documents have been uploaded or assigned to it yet. Documents will appear here once they are added to the system.
No documents yet.
— · No documents yet
This department has been created in the QMS, but no documents have been uploaded or assigned to it yet. Documents will appear here once they are added to the system.
PQR · In-Service · No documents yet
Documents will appear here once they are added to the library.
WPS · In-Service · No documents yet
Documents will appear here once they are added to the library.
WQT · Pipeline · No documents yet
Documents will appear here once they are added to the library.
SKG-261 — General Procedures
General field procedures applicable to all disciplines (material receiving, welding consumable, NCR, handover, calibration, NDT, etc.)
SKG-261 — Pipeline Procedures
Pipeline construction procedures — covering all phases from ROW preparation to cathodic protection.
SKG-261 — Piping Procedures
Above-ground piping — fabrication, welding, installation, flange assembly, hydrotest and coating procedures.
SKG-261 — Civil, Structural & Equipment Installation
Earthworks, concrete, structural steel, anchor bolt and equipment installation procedures.
SKG-261 — Electrical Procedures
Electrical material receiving, cable tray installation, equipment installation, earthing and electrical testing procedures.
SKG-261 — Instrumentation & Telecom Procedures
Instrumentation and telecom field installation, cabling, panel wiring, calibration and loop testing procedures.
SKG-261 — Inspection & Test Plans
Inspection and test plans (ITPs) prepared for all disciplines — pipeline, piping, equipment, civil, electrical, I&T and camp.
SKG-261 — Registers
Project-wide tracking registers — NCR, calibration, TQ-DR and welding consumable.
SKG-261 — Plans
Construction Quality Plan for the SKG-261 project.